703: (PDB) GMP Amendment Template
703: (PDB) GMP Amendment TemplateFor Progressive Design-Build projects, many project costs are typically lumped together within the Design-Build GMP. For SCAP purposes, these costs must be separately identified and allocated to the appropriate cost categories. Districts should begin tracking and separating these costs at the D-3 stage (and earlier, if appropriate) and maintain the breakout throughout the project as the GMP is developed and amended.
The cost breakdown will be required as part of the applicable D-7 and D-9 submissions. The template below is provided as a guide to the cost information that will be requested in those D-forms; the template itself does not need to be submitted. Amounts must reconcile to the applicable GMP amendment and, ultimately, the total Design-Build contract value.
GMP Amendment Template
Amendment #:
New or New-in-Lieu Construction Cost
| Category | Cost |
|---|---|
| Base Bid | $0.00 |
| Alternates | $0.00 |
| Base Bid + Alternates (Subtotal) = | $0.00 |
| 7% Eligible Tax | $0.00 |
| Sub Total = | $0.00 |
| 2% Local Excess Tax | $0.00 |
| Total = | $0.00 |
Architectural and Engineering Fees
| Category | Cost |
|---|---|
| New Construction | $0.00 |
| Modernization | $0.00 |
| Non-Matchable | $0.00 |
| Total A/E Fees = | $0.00 |
Other Services (including Design-Build GMP Contract)
| Category | Cost |
|---|---|
| Educational Specifications | $0.00 |
| Energy Report (ELCCA) | $0.00 |
| Value Engineering Report (Must be facilitated by a SAVE-certified facilitator) | $0.00 |
| Constructability Review Report | $0.00 |
| Total = | $0.00 |
| Category | Cost |
|---|---|
| FINAL GMP AMENDMENT = | $0.00 |
NOTE: Total of all tables should total the GMP Amendment Amount
Modernization Construction Cost
| Category | Cost |
|---|---|
| Base Bid | $0.00 |
| Alternates | $0.00 |
| Base Bid + Alternates (Subtotal) = | $0.00 |
| 7% Eligible Tax | $0.00 |
| Sub Total = | $0.00 |
| 2% Local Excess Tax | $0.00 |
| Total = | $0.00 |
Other Non-Matchable Cost
| Category | Cost |
|---|---|
| Offsite Work | $0.00 |
| Building Demolition | $0.00 |
| Hazardous Material Abatement | $0.00 |
| Sub Total = | $0.00 |
| 9% Total Tax | $0.00 |
| Total = | $0.00 |