703: (PDB) GMP Amendment Template

Contact Information

School Facilities & Organization Regional Coordinators

Veronica Perez

Eastern Regional Coordinator
360-725-6111

Heidi Burkart

Northwest Regional Coordinator
360-725-4965

Phil Partington

Southwest Regional Coordinator
360-725-4971

For Progressive Design-Build projects, many project costs are typically lumped together within the Design-Build GMP. For SCAP purposes, these costs must be separately identified and allocated to the appropriate cost categories. Districts should begin tracking and separating these costs at the D-3 stage (and earlier, if appropriate) and maintain the breakout throughout the project as the GMP is developed and amended. 

The cost breakdown will be required as part of the applicable D-7 and D-9 submissions. The template below is provided as a guide to the cost information that will be requested in those D-forms; the template itself does not need to be submitted. Amounts must reconcile to the applicable GMP amendment and, ultimately, the total Design-Build contract value.

GMP Amendment Template

Amendment #: 

New or New-in-Lieu Construction Cost

Category Cost
Base Bid $0.00
Alternates $0.00
Base Bid + Alternates (Subtotal) = $0.00
7% Eligible Tax $0.00
Sub Total =  $0.00
2% Local Excess Tax $0.00
Total =  $0.00

 

Architectural and Engineering Fees

Category Cost
New Construction $0.00
Modernization $0.00
Non-Matchable $0.00
Total A/E Fees =  $0.00

 

Other Services (including Design-Build GMP Contract)

Category Cost
Educational Specifications $0.00
Energy Report (ELCCA) $0.00
Value Engineering Report (Must be facilitated by a SAVE-certified facilitator) $0.00
Constructability Review Report $0.00
Total =  $0.00
Category Cost
FINAL GMP AMENDMENT =  $0.00

NOTE: Total of all tables should total the GMP Amendment Amount

Modernization Construction Cost

Category Cost
Base Bid $0.00
Alternates $0.00
Base Bid + Alternates (Subtotal) = $0.00
7% Eligible Tax $0.00
Sub Total = $0.00
2% Local Excess Tax $0.00
Total =  $0.00

 

Other Non-Matchable Cost

Category Cost
Offsite Work $0.00
Building Demolition $0.00
Hazardous Material Abatement $0.00
Sub Total =  $0.00
9% Total Tax $0.00
Total =  $0.00